01 · Project Overview
People-oriented resettlement underpins infrastructure development. The resettlement zone of Zhengzhou Airport Economy Zone is a key major people-livelihood resettlement project in the region, covering more than ten construction plots and fulfilling the housing expectations of numerous residents.
The living quality of the community is closely tied to public wellbeing. For the core supporting construction of the project, the water supply and drainage pipe network serves as the underground “lifeline” of the community. Full-series engineering-specific pipes from Ruiteng Pipe Industry are adopted throughout the project. Professional, high-quality pipeline solutions lay a solid foundation for the infrastructure construction of the resettlement zone.
Project Gallery



02· Applied Pipe Products
With years of experience in the local pipe manufacturing sector, Ruiteng Pipe Industry boasts mature production techniques and strict national-standard quality control systems. A complete range of pipes is deployed for this project, fully guaranteeing the safe and stable operation of the community water supply and drainage system.
Eco-friendly, non-toxic raw materials; smooth inner walls prevent scaling and impurity buildup — safeguarding drinking water hygiene from the source.
Engineered for municipal drainage, combining high flow capacity with resistance to common chemical waste streams found in residential zones.
Rated for both cold and hot water service. Superior thermal resistance and long-term pressure stability for internal building plumbing systems.
High compression resistance and acid-alkali corrosion resistance. Excellent flexibility for underground installations under heavy road surface loads.
03· Product Advantages
Withstands heavy road loads and soil overburden without deformation
Performs reliably against soil chemistry and drainage media
Maintains structural integrity across decades of service
Adapts to slight foundation movement without joint failure
Smooth bore and fused joints drastically reduce failure risk
Cuts long-term O&M costs and reduces infrastructure renewal cycles
04· Project Challenges & Delivery Assurance
Addressing the engineering challenges of simultaneous construction on multiple plots, massive construction volume, tight schedules and huge supply demand, Ruiteng Pipe Industry gives full play to its strengths as a local enterprise — supported by large-scale mature production capacity and intelligent production workshops.
Phase 1
Engineering team surveys all plots; pipe grades and quantities confirmed against construction drawings.
Phase 2
24/7 intelligent workshop operations activated; batch production aligned to plot-by-plot delivery sequence.
Phase 3
Full-quantity delivery per schedule across all active plots simultaneously, with fittings matched to each pipe series.
Phase 4
Technical team provides on-site guidance to ensure standardized jointing and system commissioning.